1. Name: Socket Stub End 2. Size: dn20-dn110 3. Pressure: PN16 SDR11 4. Packing: Woodencas, cartons or bags. 5. Delivery: 3-7 days, Quick Delivery. 6. Product inspection: Raw material inspection. Finished product inspection. Third-party inspection upon client request.
1. Name: Socket Stub End
2. Size: dn20-dn110
3. Pressure: PN16 SDR11
4. Packing: Woodencas, cartons or bags.
5. Delivery: 3-7 days, Quick Delivery.
6. Product inspection: Raw material inspection. Finished product inspection. Third-party inspection upon client request.
Products name: Socket Joint Fusion HDPE Stub End
Sizes:20-110mm
Connection: Socket Joint Fusion
Executive Standard: EN 12201-3:2011
Colors Available: Black color, blue color, Orange, or as requested.
Packing Method: Normal export packing. by carton
Production Lead Time: Depending on the order quantity.Normally about 15-20 days for a 20ft container, 30-40 days for a 40ft container
Certificate: WRAS, CE, ISO, CE
Supply Ability:100000 Ton/Year
Payment Method: T/T, L/C at sight
Trading Method: EXW, FOB, CFR, CIF, DDU
JIZHONG(G) always supplies the best products and prices for customers. It gives customers good profit to develop their business with more confidence. If you are interested in our company and products, please do not hesitate to contact us for further information.
Welcome to contact us for product details and professional service.
SPECIFICATIONφD |
QUANTITY(PC) |
BOX SIZE(W×L×D)mm |
Unit Volumn(cbm) |
NW/CTN(KG) |
40 |
200 |
50*41*26 |
0.0533 |
9.00 |
50 |
140 |
50*41*26 |
0.0533 |
9.10 |
63 |
100 |
50*41*26 |
0.0533 |
9.00 |
75 |
80 |
50*41*26 |
0.0533 |
10.40 |
1. Technology R & D of HDPE fittings
*Provide customers with more efficient and quality solutions for water and natural gas transportation, enabling our customers to improve the quality and performance of their work sites.
*There is also the safety of HDPE fittings, such as geolocation of previously welded parts and reduced test time.
2. Customer-specific solutions
According to customers' specific needs, we provide the most cost-effective solution. We produce custom parts that meet the requirements of all technical customers: we manufacture tubes of any contour and diameter.
3. Technical Support within 24 hours
Through professional, timely, and effective technical assistance, close communication with customers, the fastest and most efficient solution to customer problems, and establishing strong contacts.
4. Good service life/Long Service Life, At least 50 years of usage life.
5. Wear Resistance/Good Wear Resistance
6. Lower system and maintenance costs
7. Good Flexibility
8. Small Flow Resistance
|
|
Normal export packing by carton |
Custom LOGO is available |
1.Are you a manufacturer?
Yes, our factory was set up in 1990. Our company is integrated with industry and trade.
2.Acceptable payment methods?
We can accept T/T, L/C and etc.
3.How long will it take to deliver?
It takes generally 30-50 days.
4.What certification has your company passed?
Our company has passed the ISO9001:2005 system certification. And our products have passed UL and FM fire safety certification.