*DIN Hot Dipped Galvanized-Union Flat Seat *DIN Black-Union Flat Seat *DIN Hot Dipped Galvanized-Union Taper Seat *DIN Galvanized Fittings Conical Union Taper Seat M&F
Malleable Iron Pipe Fitting - DIN Union Details: Type: Union,Flat Seat,without Gasket. Size: 1/4''to 6'' Finish: Hot Dipped Galvanized, Black, Electro Galvanized, Usage: Fire Protection (Fire Fighting), plumbing, Oil,Gas,infrastructure construction, and decoration, etc. DIN Standard: Material: EN1562 Dimension: EN10242 Galvanization: ASTM A153 Threads: ISO7/1 |
Mechanical Property: Tensile strength: Min. 33kg/mm² Elongation: Min.6% Hardness: Max. 150HB Test Pressure:25kg/cm² Working Pressure:16kg/cm² Delivery: 45-50days after prepayment |
SIZE |
Inch |
1/4 |
3/8 |
1/2 |
3/4 |
1 |
11/4 |
11/2 |
2 |
21/2 |
3 |
4 |
mm |
8 |
10 |
15 |
20 |
25 |
32 |
40 |
50 |
65 |
80 |
100 |
|
Dimensions |
A |
42 |
45 |
48 |
52 |
58 |
63 |
64 |
78 |
85 |
95 |
110 |
PACKING LIST
SIZE OF CARTON
Type
Length(mm)
Width(mm)
Depth(mm)
Capacity(Cft)
Weight(kgs.approx)
A
470
305
195
1.4
2
B
305
240
195
0.8
1
Two inner boxes then master seaworthy carton.
Custom LOGO is available
Basic Information on Pipe Thread
DIN STANDARD THREDS(DIN:2999)
Straight pipe Threads.the pitch,angle,and depth of the corresponding dimensions of the taper pipe threads.
Detailed parameters of the DIN standard basic size comparison table
G manufactures a variety of pipe fittings, pipes, and components in various wall thicknesses and materials (such as air hose couplings and clamps, butt welded pipe fittings, PTFE thread seal tape, etc.). Materials primarily include Malleable iron, carbon steel, stainless steel, ductile iron, and plastic fittings (CPVC/PVC/PE),
We possess strong capabilities and extensive experience in cutting and threading pipes. we can provide custom lengths, special threads (ANSI Standard pipe fittings, BS Standard pipe fittings, DIN Standard pipe fittings, etc.), and special end finishes.
1.Are you a manufacturer?
Yes, our factory was set up in 1990. Our company is integrated with industry and trade.
2.Acceptable payment methods?
We can accept T/T, L/C and etc.
3.How long will it take to deliver?
It takes generally 30-50 days.
4.What certification has your company passed?
Our company has passed the ISO9001:2005 system certification. And our products have passed UL and FM fire safety certification.